Take a look at the updated street and paving plan:

What are the aesthetic elements that have been selected for the corridor?


Take a look at the current (60%) design plan:

Construction planning is underway. View the prelimininary construction plans and learn about the our ideas for outreach and marketing during construction:


Want to see the street renderings for SE Pioneer Way as of August 2010? Take a look:







Want to be added to the mailing list? Contact Eric Johnston, City Engineer, at (360) 279-4522 or ejohnston@oakharbor.org.
No comments:
Post a Comment